In short: A double storey frame only works if each load has somewhere to go. On several Manor Lakes frames, some did not.

The load path

Roof and upper floor loads travel down through walls, onto floor trusses or beams, and then to the ground floor walls and slab. Every connection along the way is detailed in the engineering.

What we recorded

In June 2026, braced walls and loadbearing studs upstairs did not bear over the floor trusses meant to carry them. In December 2025, strongbacks lacked framing anchors and shear blocks lacked their screws.

Why it happens

Trusses arrive from the factory to one layout and walls are set out on site to another. Small shifts add up, and hardware is easy to leave for later and forget.

Why frame stage is the only chance

Once the ceiling and plaster are on, these connections cannot be seen. The first sign of a problem later is cracking or a floor that feels soft.

What to send us

The framing, floor truss and bracing drawings. Most findings at this stage are a difference between the detail and what was built.

Written by our local inspection team from work carried out in Manor Lakes. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Manor Lakes

All guides →

Book a building inspection in Manor Lakes

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Manor Lakes owners ask about this

Is a missed shear block screw serious?

It is a departure from the engineering on a structural connection, so it should be fixed or approved in writing by the engineer.

Can the builder ask the engineer to approve it?

Yes. Written approval of the as-built detail is a proper way to close the item.

Are single storey homes affected?

Less so. The upper floor is where most of these connections live.

Will you check again at lock-up?

Yes, open frame items are carried into the lock-up report.